contact byrom-davey
> Back to Projects
> Back to Projects
> Back to Projects
> Back to Projects

Covina Valley District Stadium & Building

Covina Valley District Stadium & Building

project details

Construction of new track and field, bleachers, parking lots including paving and striping. New underground drainage, water service, irrigation, fire service etc. for new building. New MUSCO lighting and site lighting, landscape planting, new sidewalk improvements, synthetic turf installation at landscape area. New site detention basin. New 19,000 sf multipurpose building with kitchen, concessions, team rooms, multipurpose room on 2nd floor. Additional scope was added to include new low voltage sound system, tv's and projection screens. New video board was added to the outside of the building. Key features of the building includes: elevator, kitchen equipment, furniture, conference table, landscaping around building, lighting, stair landings on side of building with handrails. Masonry and stucco on outside of building.

  • Seven (7) Acres Site Improvements
  • 19,000 S.F. Team/Locker, Multipurpose, 
  • Restrooms & Concession Building
  • 2,551 Seat Stadium Home Bleachers & Press Box
  • 1,486 Seat Stadium Visitor Bleachers
  • 80,000 S.F. Synthetic Turf Field
  • 65,000 S.F. Synthetic Track Surfacing
  • Four (4) Stadium MUSCO LED Sports lighting 
  • Video Scoreboard on Exterior of Building
  • Decorative Wrought-Iron Perimeter Fencing
Client:
Covina Valley Unified School District
Date Completed:
2017
Location:
Covina, CA

EXPLORE RELATED